The Archive is switching to English - English: 2019 | 2020 | 2021 | 2022 | 2026 - Spanish: 2023 | 2024 | 2025
Today was the big event of the year; 10,000 people attended the event in Times Square. The ceremony was presided over for the first time by the President of QAEC; the director of the fortress was unable to attend due to his absence.
An agreement has been reached to build a new logistics center in La Fortaleza; construction is scheduled to begin in March 2022.
Construction of the main stage for the event of the year has been completed; today, Sakoro met with an Amazon executive to discuss the construction of a logistics center at the fortress.
Preparations are underway to ring in the New Year 2022; the number 1 has been replaced with the new 2, and the main stage is being built.
Work has begun on installing lasers at the entrance to the fortress so that they can project the colors of the fortress's flag: green, light blue, cyan, and dark blue.
Renovations to expand the fortress walls have begun, with the approval of Spanish Head of State Felipe VI.
HAPPY 2ND ANNIVERSARY: Today marked the fortress's second anniversary; this morning, Sakoro Zensky was officially proclaimed president of the fortress.
Preparations are underway for the fortress's anniversary celebration. Getting ready for the 2-year anniversary.
The inspection conducted by the OSHA Division identified construction defects, and work on the upper office building can now continue.
Construction Update: While the building was under construction, the infrastructure pillars collapsed. The accident left 34 people injured; there were no fatalities.
QAEC has approved the construction of an office building on the QSERF site that will serve as the entrance to the facility.
Today we received a new shipment from Durham Electronics so we can replace the fuel cells in the DMR.
This is Sakoro Zensky's first month in charge of the fortress and the O5 Council, and his leadership has led to improvements in the fortress's security measures.
This is the first full week of using DMR power; no voltage drops have been detected, and the DMR produces continuous, stable power.
Today is the big day—the DMR startup process has begun. It has been a success; the calculations have been made, and it can supply power to the entire fortress.
Preparations are underway for the DMR's startup; it is expected that the DMR will be able to supply enough power to energize the entire fortress without relying on external power.
Based on the minutes drawn up by the former director, Sakoro Zensky is hereby proclaimed Director and Head of the O5 Council; the official proclamation ceremony will take place on the fortress’s next anniversary, August 14, 2021.
IMPORTANT ANNOUNCEMENT: Director and founder Creeper M1255 has resigned as chief director of the O5 Council, citing personal reasons. He signed his letter of resignation today, and the next director and chief of the O5 Council will be elected within the next 3 days. Sakoro Zensky (Creeper M1255’s nephew) is expected to be elected as the next director.
The DMR containment chamber has been fully sealed, and work is now underway to prepare and install the remaining lasers in the room.
The DMR is being brought into the containment chamber; thanks to the four massive cranes, it was possible to position the DMR optimally to synchronize it with the gravitational lasers.
Construction of the DMR, located on the western side of the fortress, has been completed, and work has begun to remove the top slab of the DMR’s containment chamber so that it can be moved into the room.
Work has begun on installing the necessary equipment in the DMR control room. In addition, construction of the DMR above ground is continuing.
Construction is underway on the new hotel from the Marriott Inc. hotel chain, which will be called the Marriott Marquis.
Construction begins on the Dark Matter Reactor, a spherical superstructure with six arms, three of which will receive energy from the lasers and three of which will supply energy to the turbines.
An agreement has been reached with Durham to have the company cooperate on the construction of the future dark matter reactor, or DMR (Dark Matter Reactor).
Construction of the deep cavern has been completed, and QAEC is expected to begin construction of the facility's reactor.
To celebrate the New Year, Durham Electronics has given us a huge sign displaying the number of years since the fortress was founded.